ADU Cost Analysis: Full Breakdown Of 2024 ADU Development Expenses

Advertisement

Homeowners planning for ADUs must know the costs fully rather than an estimate. Here, we discuss the specifics of ADU development expenses, including costs for new construction and another type of garage conversion, offering all the data needed for proper decision-making.

Average ADU Costs

New construction of ADU cost between $146,500 and $216,500; it should be noted that the pricing may differ depending on the home's complexity and the additional features selected. More importantly, converting a 2-car garage into an ADU usually excludes high expenses, which range from $111,750 to $158,750. Such numbers within the range combine, for instance, a lot of things, such as architectural and engineering design, city fees, building labor, materials, and finishing materials.

Understanding ADU Costs

ADU Cost Analysis: Full Breakdown Of 2024 ADU Development ExpensesAuto Draft

Several people planning to build an ADU might be dismayed by the fact that actual ADU costs may differ from their expectations, which could result from their browsing online or having heard stories from their friends. The pathway of building a new ADU community resembles that of building an individual home for a new household; however, it has some other aspects attached.

Breakdown of Costs

Design and Planning:

Typical design involves a range of $6,000 - $14,000 in architecture drawings, engineering measurements and energy calculating, surveying a land area, and so on.

City Fees:

Whether it is city-specific or is of an ADU in particular, the fixed costs change from $3,000 to $11,000.

Construction Labor and Materials:

Varying contractor fee rates are also charged, emphasizing the hiring of professional experts to eliminate secret costs. Economic costs depend on factors such as design choices and the existence of a partnership with local suppliers and can vary, on average, from $175 to $225 per square foot for garage conversions to $250 to $350 per square foot for new buildings.

Finish Materials:

The budget for finishing materials will account for sizes as large as $50 to $75 for every square foot of space that a booth will occupy. Care is needed in choosing the flooring, doors, windows, cabinetry, tiling, and stone to ensure they are all chosen with consistent aesthetics in mind.

Levi Construction: Developing Models for ADU Excellence

With nearly 20 years of experience in the building industry, Levi Construction has been strongly establishing itself as a synonym of top-notch and reliability in ADU construction. From new construction to modified ones, Levi Construction brings aesthetics and exceptional quality, specialized designing skills, and meticulous workmanship to transform your ADU dream into a reality.

Factors Influencing ADU Costs

Different aspects influence ADU costs, starting from the design complexity, property conditions, utility connections, and size. While building a garage can cost 20%- 25% less than new construction, the existing foundation and structures afford most of the savings.

Conclusion

Coming up with ADU requires wisely and cautiously planning the wide range of costs that might be incurred during the process. The factors to consider, such as the size of the project, the location for the construction, and the type of architecture of the design house, will help you get the right option and make your financial option the best.